Every provider quotes '30 to 90 working days' for a leased line install, and every buyer hears '.. so, three months?'. It doesn't have to be. Where your install lands in that range is mostly decided by things that happen (or don't) in the first two weeks. Here's the real timeline, stage by stage, and the levers that pull it toward the fast end.
Week 0: order and availability
The clock starts with the availability check: which carriers can serve your address, and is fibre already at or near the building ('on-net') or does it need building ('off-net')? This single fact sets your realistic range. On-net installs can complete in a few weeks; off-net installs are the ones that stretch toward 90 days.
A carrier-neutral check across every network serving your postcode, rather than one carrier's view, often finds an on-net option the single-carrier quote missed.
Weeks 1–2: survey and wayleaves
The carrier surveys the route: where the fibre enters, how it runs through the building, and what permissions are needed. In leased or multi-tenant buildings that permission is a wayleave from the freeholder, and it's the most common stall point in the whole process.
The lever: start the wayleave conversation with your landlord or managing agent on day one, in parallel with the survey, not after it. Two weeks saved here is two weeks off the whole project.
Weeks 3–10: the build
For off-net installs, this is the construction phase: duct work in the street, fibre pulled to the building, internal cabling to your comms room. Timescales here belong to civil works and council permits rather than technology, which is why nobody can honestly promise a date until the survey is done.
Your provider's job during the build is chasing: carrier appointments, contractor scheduling, progress reporting. An unmanaged install sits in queues; a managed one keeps moving.
Go-live week: from lit fibre to working circuit
Once the fibre is lit, the service is tested end to end, your router is configured and installed, monitoring is switched on and the SLA becomes active. This final stage is days, not weeks, and includes a proper handover: speeds proven, failover tested if you have backup, documentation delivered.
Can't wait? Bridge it
If the business needs connectivity before the fibre lands (an office move is the classic case), a business-grade 4G/5G service can be live within days, then stays on as your automatic backup once the leased line takes over. Order the line the day you sign the lease, bridge with wireless, and the install timeline stops being scary.
